Ad Code

ACTION TO BE TAKEN DURING SPILLAGE/ BREAKAGE OF MATERIAL SOP


ACTION TO BE TAKEN DURING SPILLAGE/ BREAKAGE OF MATERIAL SOP

1.0   PURPOSE:

1.1.  To lay down procedure for action to be taken during spillage/ breakage of material.



2.1  This SOP shall be applicable for spillage/ breakage of materials in Stores Department.



3.1       Store officer.
3.2       Q.A. In-charge/ Store In-charge.


4.0    ACCOUNTABILITY:

4.1       Head of the Store Department.

5.0      PROCEDURE:

5.1       FOR SOLID MATERIALS:
5.1.1    If any spillage/ breakage are occurred, Store person shall segregate or shift other surrounding materials to avoid contamination.
5.1.2    Store person shall intimate to QA person about the incidence for corrective action.
5.1.3    With the help of vacuum cleaner or nylon broom, spilled material shall be collected by taking sufficient safety precautions before cleaning the area. (i.e., wear safety goggles, nose mask, hand gloves etc.)
5.1.4    Transfer the contents of affected container or bag to another good and cleaned container or bag.
5.1.5    Weigh and note the quantity of the spilled material and destroyed as per SOP in presence of QA person. After approval from HOD QA/QC and unit Head, same quantity is to be deducted from the SAP and from the respective bin card.
5.1.6    Prepared the incident report with cause of accident and appropriate corrective action to avoid recurrence of such incident.
5.2       FOR SOLVENTS:
5.2.1    In case of spillage or leakage of solvent, immediately open the windows or doors (if possible) for proper ventilation.
5.2.2    Store person shall restrict the area for minimum man movement.
5.2.3    Mop the area as per the SOP with all safety precautions like wearing nose mask and safety goggles and discard the spilled solvent in the ETP.
5.2.4    Transfer the contents of affected container or drum to another good or cleaned container or drum (if possible).
5.2.5    Weigh and note the quantity of the spilled material and destroyed as per SOP in presence of QA person.
5.2.6    After approval of HOD QA/QC and Unit Head, the same quantity is to be deducted from the SAP and from respective bin card.
5.2.7    Note the cause of accident and take appropriate corrective action to avoid recurrence of such incident.




7.1       Not Applicable

8.0      ABBREVIATIONS:


Abbreviation
Expanded Form
S
Standard operating procedure
&
And
%
percentage
06
Inventory Control