Preventive Maintenance Of Instrument
1.0 OBJECTIVE:
To
lay down a procedure for the Preventive Maintenance of Instruments.
2.0 SCOPE:
This
SOP is applicable for preventive maintenance of Laboratory Instrument (other
than HPLC) in Q.C, Pharmaceutical Manufacturing.
3.0 RESPONSIBILITY:
3.1
Officer/Executive-Quality
Control.
4.0 ACCOUNTABILITY:
4.1
Manager-Quality
Control.
4.2
Head of the Q.C Department.
5.0 PROCEDURE:
5.1 General
Precaution/ Safety:
5.1.1
Switch OFF the
instrument before the starting of preventive maintenance.
5.1.2
After preventive
maintenance is over, switch ON the instrument and check the voltage supply.
5.2 Analytical
Balance:
5.2.1
Clean the weighing
pan with the help of lint free cloth.
5.2.2
Check the door for
free movement. Clean the door path, if required with the help of lint free
cloth soaked in Methanol and wipe immediately with the help of dry lint free
cloth.
5.2.3
Open the cover of
the equipment and check all the connector and rectify any loose contact if
observed. Clean the PCB with vacuum cleaner and lint free cloth soaked in
carbon chloride. Check the voltage on power supply card. Remove all the dust
from the instrument using vacuum cleaner. Close the cover of the equipment and
ensure proper leveling of the equipment.
5.2.4
Close the cover of
the instrument and check proper start up of the instrument.
5.3 UV/VIS
Spectrophotometer:
5.3.1
Open the cover of
the instrument and clean the instrument with the help of lint free cloth soaked
in Methanol. Isopropyl alcohol and wipe immediately with dry lint free cloth
and clean all PCBs with the help of vacuum cleaner. Check all the connector for
proper contact and rectify any loose connection if observed. Check the voltage
on power supply card.
5.3.2
Clean the sample
compartment with the help of lint free cloth.
5.3.3
Check the UV and
tungsten lamp for ignition.
5.3.4
Check and clean
the optical system.
5.3.5
Check the filter
wheel and it drive mechanism for jerk free operation and rectify it if
required.
5.3.6
Close the cover of
the instrument.
5.4 Fourier Transform
Infrared Spectrophotometer (FTIR):
5.4.1
Open the cover of
the instrument. Clean the instrument with the help of lint free cloth soaked in
Methanol/ Isopropyl alcohol and wipe immediately with dry lint free cloth.
5.4.2
Check all wiring
connection. Check all the connector and rectify loose connection if observed.
5.4.3
Clean the PCBs
with the help of vacuum cleaner. Check reference voltage on the power supply
card. Check and clean the optical supply.
5.4.4
Clean the fan
inside the cabinet with free cloths.
5.4.5
Clean sample
compartment with dry lint free cloth.
5.4.6
Close the cover of
the instrument and check proper start up of the instrument.
5.5 Polarimeter:
5.5.1
Clean the
instrument with the help of lint free cloth soaked in Methanol/ Isopropyl alcohol
and wipe immediately with dry lint free cloth.
5.5.2
Open the cover of
the instrument. Clean the sample compartment with lint free cloth. Check all
the reference voltage on power board. Check all the connector and rectify any
loose connection if observed.
5.5.3
Check and clean
the cabinet fans.
5.5.4
Check the cover of
the instrument and check for proper startup of the instrument.
5.6 Melting Point
Apparatus:
5.6.1
Clean the
instrument with the help of lint free cloth wipe immediately with dry lint free
cloth.
5.6.2
Check and clean
PCB. Check all the connector and rectify any loose connection if observed.
5.6.3
Check and clean
measuring slots in cell interior.
5.7 Auto titrator:
5.7.1
Clean the
instrument with the help of lint free cloth soaked in 2.5% Dettol solution and
wipe immediately with dry lint free cloth.
5.7.2
Check all the
fitting tubes. Check all the connector and rectify any loose connection if
observed.
5.7.3
Check the burette
movement.
5.7.4
Check stirrer
motor for proper operation.
5.8 Leak Test
Apparatus:
5.8.1
Clean the
instrument with the help of lint free cloth soaked in Methanol/ Isopropyl
alcohol and wipe immediately with dry lint free cloth.
5.8.2
Check the leveling
leg screw of the equipment and ensure leveling of the instrument.
5.8.3
Check and ensure
proper spindle mounting.
5.8.4
Check and ensure
proper operation of speed adjusting knob.
5.9 Vacuum Oven:
5.9.1
Clean the
instrument with the help of lint free cloth soaked in Methanol/ Isopropyl
alcohol and wipe immediately with dry lint free cloth.
5.9.2
Check the door for
proper closing and sealing. Check the gasket of the door.
5.9.3
Check the vacuum
pump and replace the oil, if required. Check the vacuum tubing.
5.9.4
Check the heater
connection and ensure proper working of thermostat/ temperature controller.
5.10
Autoclave:
5.10.1
Clean the
instrument with the help of lint free cloth soaked in Methanol/ Isopropyl
alcohol and wipe immediately with dry lint free cloth.
5.10.2
Check wiring
connection. Check and ensure proper sequencing of input/output of the PLC.
Check the safe line of the instrument.
5.10.3
Check the door for
proper closing and inter locking. Check the gasket of the doors.
5.10.4
Check the boiler
heater. Check safety valve of the boiler.
5.10.5
Check vacuum pump
and rectify any leakage if required.
5.11
General
Procedure:
5.11.1 Record
the observation preventive maintenance log (Reference annexure-1).
5.11.2 Inform
the discretion observed, if any, to Q.C-Manager.
5.11.3 Preventive
maintenance shall be performed at every three month ±15 days.
6.0 REVISION LOG:
Revision No. |
Effective Date |
Reason |
00 |
|
New
SOP |
7.0 REFERENCES:
7.1
Not Applicable.
8.0 ANNEXURES:
Annexure 1: Preventive
Maintenance Log.
Annexure:
1
Preventive
Maintenance Log
Format
No.: ________________
PREVENTIVE MAINTENANCE SCHEDULE CUM
REPORT Instrument:
___________________ Instrument
No.: ________________ Frequency:
Quarterly. |
||||||||
Sr. # |
Check point |
Preventive maintenance schedule cum
report |
||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Preventive
Maintenance Done on |
|
|
|
|
|
|
|
|
Signature/Done
by |
|
|
|
|
|
|
|
|
Remarks
|
|
|
|
|
|
|
|
|
Next
due on |
|
|
|
|
|
|
|
|
Checked
by |
|
|
|
|
|
|
|
9.0 ABBREVIATIONS:
Abbreviation |
Expanded Form |
S |
Standard operating
procedure |
& |
And |
% |
percentage |
HPLC |
High performance liquid
chromatography |
PBC |
Printed circuit board |
UV/VIS |
Ultra violet/ visible |
FTIR |
Fourier Transform
Infrared Spectrophotometer |
% |
Percentage |