SOP For building maintenance is described in this post which you can follow in the section of the General Industry SOP.
OBJECTIVE
To describes the procedure to be followed for Building Maintenance.
SCOPE
The procedure is applicable for all the external & internal areas in the plant.
RESPONSIBILITY
Technicians
Engineers
ACCOUNTABILITY
Head Engineering
PROCEDURE
Ensure that all the area to be painted is made available & the articles lying in the area are properly covered.
Roofs above the following areas and internal walls and external walls are checked for cracks, and crevices, before the start of the rainy season.
- Administration Block.
- Production area.
- Quality Control Laboratory.
- Service Area.
- Utility Blocks.
- All drains are checked for chokes & blockages and cleaned if required.
Underground drains are checked for chokes & blockages and cleaned if required.
All the utilities pipelines are checked for any leakage or rusting.
Plaster/repair of walls & floors will be finished by meson.
Painting/white wash will be done by painter. Repair of PVC. drain lines will be done by plumber only.
Wooden/Glass work will be done by carpenter.
Engineering department will depute the persons for every building maintenance work.