Standard operating procedure of Entry Procedure for Executives in Pharmaceuticals Premises is describe here.
{getToc} $title={Table of Contents}
1.0 OBJECTIVE:
To lay down a procedure of entry for Executives in Pharmaceutical Plant.
2.0 SCOPE:
This is applicable to all the executives working in the plant.
3.0 RESPONSIBILITY:
3.1 Doing: All concerned Executive entering in respective department.
3.2 Checking: Executive/ Officers of Production, QC& QA.
4.0 ACCOUNTABILITY:
4.1 Head of Quality Assurance Department.
5.0 PROCEDURE:
5.1 ENTRY PROCEDURE:
5.1.1 Only authorized personnel are allowed to enter into the plant.
5.1.2 Cross reception to enter in change room.
5.1.3 Swap the card into while entering the change room.
5.1.4 Enter the change room; firstly, keep the personnel belongings into the locker provided.
5.1.5 Sitting on the step over bench remove the street foot-wears & keep it in shoe locker provided in the grey side box of change room. While sitting on the step over bench it shall be crossed swinging the leg over the bench.
5.1.6 Wear the plant sleepers which are dedicated for white side of step over bench.
5.1.7 Enter into the wash area. Wash hands with liquid soap and dry with hand dryer.
5.1.8 Production, QC & QA Executives put on the respective clean linen or laboratory dress from the safe of change room.
5.1.9 Then attire, shall be put on in the following sequence:
5.1.9.1 The outside clothes shall be removed, kept in locker.
5.1.9.2 Put on the laboratory dress white apron for QC executive.
5.1.9.3 Wear colored jacket and then coloured trouser, for production executive. Tuck the shirt in the trouser.
5.1.9.4 Put on socks and shoes dedicated for areas.
5.1.9.5 Put on the coloured cap to completely cover hair and ears.
5.1.9.6 Put on the mask.
5.1.10 Observe yourself in the mirror and ensure that hair is completely covered under cap and properly gowned according to the demonstrated photographs.
5.1.11 Sanitized the hands with disinfectant.
5.1.12 Enter the plant corridor through the air lock.
5.1.13 From this corridor proceed to respective floor depending upon the nature of job.