In this post Standard Operating Procedure of Operation And Cleaning Of Leak Test Apparatus is describe.
1.0 OBJECTIVE:
To lay down the procedure for charge hand over
between shifts.
2.0 SCOPE:
This procedure is applicable for charge hand
over between the shifts in production department.
3.0 RESPONSIBILITY:
Production: Officer /Executive/Assistant
Manager.
Head Production: To ensure execution &
compliance.
4.0 PROCEDURE:
4.1 From Current Shift To Next Shift:
Following are the instructions to be given for
current shift officer to the next shift officer for charge hand over.
4.1.1 Name of product/lot/workmen on each
machine.
4.1.2 Status of each machine i.e. whether under
changeover or under maintenance or functioning.
4.1.3 Allocation of job to next shift workers.
4.1.4 Production planning for next shift.
4.1.5 Any special precautions to be taken if
there is any problem.
4.1.6 If any change in plan, then reason for
the change. Any anticipated problem and remedy if any.
4.1.7 Showing the actual physical status.
4.2 In case the next shift officer does not
resume the duty, then the current shift officer shall continue in the next
shift also. The same is applicable for the operator / workmen.
REVISION
CARD
Sr. No. |
Revision No. |
Revision Date |
Details Of Revision |
Reason (S) For Revision |
Reference Change Control No. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|