In this post Standard Operating Procedure of Operation And Cleaning Of Leak Test Apparatus is describe.
1.0 OBJECTIVE:
To lay down the procedure for the
operation and cleaning of Leak test apparatus.
2.0 SCOPE:
This procedure is applicable for
the operation and cleaning of Leak test apparatus in production department.
3.0 RESPONSIBILITY:
Production: Officer
/Executive/Assistant Manager.
Head Production: To ensure
execution & compliance.
QA: To ensure the compliance.
4.0 PROCEDURE:
4.1 Cleaning:
4.1.1 Ensure the instrument is
switch off.
4.1.2 Remove the vacuum connection
to desiccator and take it to the washing area.
4.1.3 Drain the dye solution.
4.1.4 Clean the gasket, lid &
vessel with purified water from inside and outside.
4.1.5 Wipe the body of the
apparatus with a cleaned cloth soaked in purified water.
4.1.6 Dry it with a cleaned dry
cloth.
4.1.7 Clean the tubing and the
outside body with cleaned dry cloth.
4.1.8 Fix the gasket and assemble
the desiccators & lid and connect the vacuum connection.
4.2 Operation:
4.2.1 Ensure the cleanliness of
Leak test apparatus.
4.2.2Fill purified water in
desiccator of leak test apparatus up to the required quantity. Prepare a dye
solution by dissolving 300 mg of methylene blue crystals or adding 4 drops of
stock solution of methylene blue dye (0.01% w/v TS USP), in approximately 4000
ml of Purified water.
4.2.3 Put the main switch ‘ON’.
4.2.4 Collect the number of
blisters/strips equivalent to one full rotation of the forming.
drum/plate/sealing roller for leak
test.
4.2.5 Wear hand gloves and immerse
the blisters/strips completely in the methylene blue solution.
4.2.6 Place the mesh over the
blisters/strips then close in the desiccator.
4.2.7 Set the timer of the leak
test apparatus.
4.2.8 Switch on the apparatus and
apply vacuum till it reaches 381 mmHg and close the vacuum valve.
4.2.9 Set the vacuum parameter at
120 seconds for blisters and 120 seconds for strips then maintain accordingly.
4.2.10 Machine should auto release
the vacuum from dessicator after achieving the set parameter.
4.2.11 Open the dessicator and
remove the blisters/strips.
4.2.12 Completely dry the
blisters/strips using a clean lint free cloth / tissue paper.
4.2.13 Remove the hand gloves and
discard it by putting into waste bin.
4.2.14 Keep the collected
Blisters/strip on the table and take white A4 size paper.
4.2.15 Defoil the blisters/strips
by using cutter/Scissor and remove the tablets/capsules on white paper and
check for any physical deformation or presence of moisture / Color.
4.2.16 Check the tablets/capsules
for other side by taking one more paper putting on the first one and accurately
turn around the same to ensure on reverse side also.
4.2.17 Check any physical
deformation or presence of moisture/color in tablets/capsules.
4.2.18 Discard the defoiled samples
of tablets by putting into water.
4.2.19 In Case of any failure in
Leak test, segregate the packed shipper, packed after last successful leak test
performed as per the batch packing record. Also segregate the primary and
secondary goods on the line. Inform to Production and QA head for necessary
action.
4.2.20 Record the same in the
respective BPR.
4.2.21 Leak test to be performed at
the start of shift/batch and after every two hour of the batch run
alternatively by production and QA. (Or as per frequency mentioned in BPR).
4.3 Precaution:
4.3.1 Ensure that there is adequate
lightening while carrying out the leak test.
4.3.2 Ensure that the gloves are
dry prior to defoiling of blisters/strips.
4.4 Limit:
4.4.1 No tablets/capsules shall be
affected during leak test i.e. any penetration of water to observed. in any
strip/blister.
5.0 ANNEXURE (S):
Nil
6.0 REFERENCE (S):
SOP: Preparation, approval,
distribution control, revision and destruction of Standard Operating Procedure
(SOP).
7.0 ABBREVIATION (S) /DEFINITION
(S) :
BPR : Batch Packing Record
Q.A. : Quality Assurance
mg : Milligram
ml : milliliter
Mm Hg: millimeter of mercury
w/v :Weight/Volume
REVISION
CARD
Sr. No. |
Revision No. |
Revision Date |
Details Of Revision |
Reason (S) For Revision |
Reference Change Control No. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|